The construction programme that keeps up with the site.

Plan it here or bring it from P6 or MS Project. Progress comes straight from site, every change is kept, and every slip is explained.

Scroll

The problem

Most programmes are out of date the day they're issued.

Progress lives in spreadsheets, delays disappear into longer bars, and nobody can say what changed since last month. Enforsite fixes all three.

The programme

Turning a project into a programme shouldn't be hard. Now it isn't.

Draw it on the chart or import the file you already have. Either way, the logic, the dates and the critical path are worked out for you.

Riverside Tower Sam CarterControllerSC
ScheduleOutputs ▾TeamSettings View only Default ▾Edit scheduleRevisions ▾
Overview BaselineRevision B CompareReport · 11 Oct 2026 withNow Edit layout
Revision BRevision · #140 · 12 Oct 2026, 09:15 · Ann Revision ARevision · #121 · 28 Sep 2026, 16:02 · Ann
NowThe live programme at its status date Report · 11 Oct 2026#141 · 11 Oct 2026, 17:40 · Sam Report · 27 Sep 2026#118 · 27 Sep 2026, 17:22 · Sam Report · 13 Sep 2026#97 · 13 Sep 2026, 16:58 · Sam
LineNameDurationStartFinishProgress
AIWidgetsTimelineResources

Describe a change — you will see a preview before anything is applied.

Add a snagging task after “Second fix”Link “Drylining” to “Second fix” with a 2-day lagSet every “Drylining” to 3 days
Add a snagging task after second fix on every level
Thinking…
How long is the snagging task after “Second fix”?
2d1w2wCustom, e.g. 3d or 1w
1w
Thinking…
Add “Snagging” (1w) after “Second fix” on 6 levels — 6 tasks, 6 FS links
  • after “Second fix” in Block A ▸ Level 01
  • after “Second fix” in Block A ▸ Level 02
  • after “Second fix” in Block A ▸ Level 03
  • after “Second fix” in Block B ▸ Level 01 … 03

“Snagging” is new in Trade — it will be created.

CancelApplyApplied
What would you like to change?
ClearSend
Exit view

Create from a P6 or MS Project file

Choose file

A P6 XER, or MS Project XML (also how Asta and P6 export to MS Project).

Reading the file…

Primavera P6 23.12 · Riverside Tower · data date 25 Oct 2026

0 activities (36 milestones), 0 headings, 0 links, 3 calendars, progress on 0.

844 of 844 activities measure exactly as the file draws them.

▸ Approximated or left out (2)

Riverside Tower
Create project
CompleteNow
0%of 28 tasks
Tasks remainingNow
0of 28 tasks
Tasks overdueNow · as at 25 Oct 2026
0of 28 tasks
Tasks in progressNow · as at 25 Oct 2026
0of 28 tasks
Period change summaryReport · 11 Oct 2026 → Now
S-curveNow · vs Revision B
Planned (baseline)Actual
Slippage by subcontractorReport · 11 Oct 2026 → Now

Left of the line is pulled in; right is slipped.

Status distributionNow · as at 25 Oct 2026
Progress breakdownNow
Frame & envelope by levelLevel · Whole project · 5 × 6
Expand allCollapse all −100%+ Edit Regenerate
L03Frame L01–L05On track
Planned
07/09/26 → 01/11/26 (56d)
Progress
75% · expected 72%
Last update
25 Oct 2026
History×
Plan changesAnyoneAny time
● Unsaved changesSam · since 10:42 · 3 edits
▾ Revision CIn progress · since Revision B
25 Oct 14:02#146 · Sam · 3 tasks edited+3
24 Oct 16:40#145 · Ann · 14 tasks edited
▾ Revision B BaselineIssued at #140 · 12 Oct · Contract programme
12 Oct 09:15#140 · Ann · 22 tasks edited−2
9 Oct 17:30#139 · Sam · 4 tasks edited
▸ Revision AIssued at #121 · 28 Sep · Tender

Pick a save or a revision.

Revision B

Contract programme

Set as baselineCompare with nowRoll back to hereRevise
Revision B compared with now View on chart

Added · 2

Lift shaft survey

Lift guide rails

Removed · 1

Temporary works

Moved · 1

Roofing +1w

Roll back to Revision B?

Undoes 6 saved changes since 12 Oct.

1 task moves, 1 is removed, 1 comes back.

Progress reported since is kept.

CancelRoll back
DelayFrame L01–L05×
Plant breakdowns ▾
Tower crane out of service
Delete delayCancelSave
CalendarProject default

Working hours 08:00–12:30, 13:00–17:00

Start successors on a new working day

Successors: next working hour

Practical completion×
GeneralScheduleTagsProgress historyChange historyBaseline divergencePredecessorsSuccessors

Against Revision B baseline.

Finish: 21 Jan 2027 → 4 Feb 2027 (+14 days)

Focus on the variance path
1 · FINISH +14 DAYSBlock B fit-out ▸ Level 03Second fix

Driven by Drylining (FS), which finishes 14 days later than its baseline.

Through Drylining, First fix M&E and Upper floor decks, each driven by the next.

5 · FINISH +14 DAYSFrameFrame L01–L05

New delay band: Plant breakdowns, 2w. Sam Carter · 25 Oct

Filter3 results×

LOGIC Trade = Drylining AND Areas = Block A

⠿Trade is Drylining

AND

⠿Areas is Block A

+ Add a condition

Save as filter…Clear allApply

(This demo looks best on a desktop.)

Working together

Plan together without overwriting each other.

Edit live together, or one person at a time; each project chooses. Either way, nobody's half-finished change reaches the site, the reports or the client.

Live coworking

Everyone edits the same programme at once. Changes appear on every screen as they are made and are saved together at the project's midnight.

Live

Checkout

One person edits at a time. Everyone else sees the last saved plan, with who is editing, until they save and exit.

In edit by Ann

Branch & merge

Work on your own copy and merge it when ready.

Coming with the desktop app

Safe undo, even live

Undo never overwrites a colleague: if someone changed the same field since, the step is refused and you are told who and when.

Viewers see the saved plan

Half-finished edits stay with the editor. Reports, dashboards and the site team read the programme as it was last saved.

Every save is history

Each save is kept, named by its date and time, and any one of them can be compared or rolled back to.

Built for organisations

Controller

Full access: builds and reschedules the programme, manages settings and the team.

Operator

Logs progress from site, on mobile or desktop. Cannot change the schedule.

Observer

Read-only. Sees every desktop view of the project and can change nothing.

In full

Everything that sets it apart.

Import or build

  • P6 XER and MS Project XML import, with a fidelity check before anything is created
  • Each later export updates the same project; tasks keep their identity across periods
  • A baseline can come from a file
  • Draw bars and links straight onto the chart; type into the blank runway

Version control

  • Every save recorded and kept
  • Issue named revisions; split one from any earlier save
  • Any revision can be the baseline, and a baseline can be revised to take in new tasks
  • Compare on the chart; roll back to any save, and roll the roll back back

On site

  • Operator app for iOS and Android with an offline queue
  • QR codes per area, printed from the project
  • Photos and notes filed against the task, read as a day-by-day log
  • Matrices: location × activity, coloured by status

Construction reality

  • Delay bands with types and notes; lost time never vanishes into a longer bar
  • Minute precision, split shifts and lunch breaks in calendars
  • Critical path and float to any milestone or heading
  • Baseline divergence: the driving chain behind every slip

Finding things

  • One click per value, with counts before you click
  • Area trees, trades, people, progress, dates and float as filters
  • Saved filters and shared views
  • Find and replace across the programme

Reporting

  • Reporting periods that are kept for good
  • Dashboards against any chosen baseline, compared with any saved version
  • Live quick widgets beside the chart
  • Resource histograms by trade and plant

Private beta

Bring your P6 or MS Project file. We'll show you your own programme in Enforsite.

Enforsite is in private beta. Join it to run a live project free and tell us what to build next.

Join the beta See pricing